Keywords: special passenger line at the bottom of the bridge structure integrated grounding winter construction
Abstract: comprehensive grounding technology in the construction of passenger dedicated line holds the very important role, integrated grounding technology in domestic passenger special line of the application of the railway began soon, some of these technologies are not mature enough. In addition, winter construction quality control to comprehensive ground also put forward some problems. In this paper to jilin changchun passenger special line YouFang single home large bridge as an example, this paper introduces the structure of the bridge in comprehensive grounding system construction in winter of technology. We hope that this paper introduced the construction technology can get promotion.
中圖分類號(hào):TU74文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):
1.工程概況
單家油坊特大橋地處吉林省吉林市,該地區(qū)屬中溫帶大陸性季風(fēng)氣候區(qū)。按照對(duì)鐵路工程影響的氣候分區(qū),該區(qū)為嚴(yán)寒地區(qū),最低溫度-36.5℃,最大季節(jié)凍土深度1.92m。
單家油坊特大橋全長1509.30m,墩臺(tái)身46座。其中樁基礎(chǔ)37座、擴(kuò)大基礎(chǔ)9座。。橋址上覆第四系全新沖洪積層粉質(zhì)粘土,下伏華力西期花崗巖及燕山期侵入閃長巖。勘測(cè)期間地下水埋深1.8——9.7m,主要有大氣降水補(bǔ)給。
2.橋梁綜合接地技術(shù)要求
依據(jù)鐵集成[2006]220號(hào)文件文件中規(guī)定,在工程設(shè)計(jì)和實(shí)施中,確保綜合接地系統(tǒng)的電阻值不大于1歐姆。橋梁綜合接地系統(tǒng)所涉及的接地筋和連接鋼筋等應(yīng)充分利用橋梁的非預(yù)應(yīng)力結(jié)構(gòu)鋼筋,以優(yōu)化綜合接地系統(tǒng)的設(shè)計(jì)方案,確保接地性能、降低工程造價(jià)。
按DB997-0223規(guī)范的規(guī)定鋼筋間的連接應(yīng)采用搭接焊工藝,焊接長度為單面焊接長度不小于100mm、雙面焊接長度不小于55mm,鋼筋十字交叉時(shí)采用14mm(IK≤25kA)或16mm(IK>25kA)的“L”形鋼筋焊接。(見圖2-1)
圖2-1
3.施工流程
3.1橋梁綜合接地設(shè)計(jì)
3.1.1樁基礎(chǔ)橋墩綜合接地
在每根樁中應(yīng)有一根接地鋼筋,樁中的接地鋼筋在承臺(tái)中應(yīng)環(huán)接,橋墩中應(yīng)有兩根接地鋼筋一端與承臺(tái)中的環(huán)向鋼筋相連,另一端與墩帽處的接地端子相連。在每個(gè)橋墩垂直于線路方向的某個(gè)側(cè)面、距地面-200mm處,設(shè)一個(gè)不銹鋼接地端子,供測(cè)試用。(見圖3-1)
3.1.2擴(kuò)大基礎(chǔ)橋墩綜合接地
在基底底面設(shè)一層鋼筋網(wǎng)作為水平接地極,水平接地極鋼筋網(wǎng)格約為1m×1m;在各層的四周設(shè)置垂直接地鋼筋,垂直接地鋼筋的間隔為層高的2倍;垂直接地鋼筋在基頂頂面處用連接鋼筋環(huán)接,并用墩身中的兩根結(jié)構(gòu)鋼筋引至墩帽處的接地端子;水平接地極鋼筋網(wǎng)格、垂直接地鋼筋的外緣距混凝土表面不大于70mm;水平接地鋼筋網(wǎng)格節(jié)點(diǎn)應(yīng)焊接;在每個(gè)橋墩垂直于線路方向的兩個(gè)側(cè)面、距地面-200mm處,各設(shè)一個(gè)不銹鋼接地端子,供測(cè)試和栓接附加接地極用;經(jīng)測(cè)試,當(dāng)貫通地線的接地電阻大于1歐姆時(shí),可另設(shè)附加接地極。(見圖3-2)
圖3-1橋梁樁基礎(chǔ)接地連接示意圖圖3-2橋梁擴(kuò)大基礎(chǔ)接地連接示意圖
3.2施工流程(見圖3-3)
3.3施工準(zhǔn)備
3.3.1在現(xiàn)場(chǎng)做擋風(fēng)設(shè)施,用現(xiàn)場(chǎng)腳手架鋼管搭建架子,上掛帆布作為擋風(fēng)設(shè)施。規(guī)定當(dāng)現(xiàn)場(chǎng)風(fēng)速超過5.4m/s(3級(jí)風(fēng))時(shí),必須使用該擋風(fēng)設(shè)施。
3.3.2現(xiàn)場(chǎng)設(shè)溫度監(jiān)控點(diǎn),在現(xiàn)場(chǎng)使用溫度計(jì)隨時(shí)控制現(xiàn)場(chǎng)溫度。規(guī)定當(dāng)溫度低于-20℃或下雪時(shí)時(shí),不允許施工。
3.3.3重新安排焊工倒班制度,每個(gè)焊工要求上午、下午各一班,每班不超過2小時(shí),減少焊工連續(xù)工作時(shí)間,避免人為原因?qū)C合接地質(zhì)量造成影響。
3.3.4現(xiàn)場(chǎng)帳篷內(nèi)配備火爐,以供焊工隨時(shí)取暖。
3.4接地鋼筋的焊接
3.4.1接地鋼筋定位
由于綜合接地鋼筋利用了承臺(tái)及墩身的機(jī)構(gòu)鋼筋,并且施工時(shí)為多人同時(shí)施焊,容易形成焊接鋼筋錯(cuò)位,利用鋼筋混淆等現(xiàn)象。所以現(xiàn)場(chǎng)規(guī)定先對(duì)綜合接地鋼筋進(jìn)行單獨(dú)施焊,待檢查無誤后,在接地鋼筋上做上記號(hào)。然后再進(jìn)行其他鋼筋的焊接。
3.4.2綜合接地鋼筋焊接參數(shù)
(1)鋼筋間的連接應(yīng)采用搭接焊工藝,優(yōu)先采用雙面焊,在條件困難下可采用單面焊。焊接長度為單面焊接長度不小于100mm、雙面焊接長度不小于55mm,鋼筋十字交叉時(shí)采用14mm(IK≤25kA)或16mm(IK>25kA)的“L”形鋼筋焊接。
(2)冬季施工與正常施工相比,主要的問題是低溫引起的冷卻速度加快的問題。由于焊縫冷卻速度加快,容易導(dǎo)致焊縫有淬硬傾向,導(dǎo)致鋼筋焊接質(zhì)量不良。所以,在冬季施工過程中,要注意采取以下幾點(diǎn)措施:
①施焊時(shí),應(yīng)先從中部引弧,這樣就會(huì)對(duì)兩段起到預(yù)熱的作用。
②要采用緩冷措施,采用多層施焊,層間溫度控制在150~350℃之間,其中,第一層焊縫要具有足夠的熔深,主焊縫和定位焊縫應(yīng)熔合良好,使接頭熱影響區(qū)附近的冷卻速度減慢1~2倍左右,從而減弱了淬硬傾向,改善了接頭的綜合性能。
③焊接過程中要經(jīng)常清除焊渣。
超高層群體建筑與普通的建筑有著明顯的施工上的不同,超高層群體建筑其本身的施工難度就相對(duì)較大,如果其施工的現(xiàn)場(chǎng)場(chǎng)地狹小,將會(huì)使得施工的難度進(jìn)一步加大,在這種情況下,要想保障超高層群體建筑的施工質(zhì)量,就需要采用合理的施工技術(shù),以保障施工的順利開展。而在目前的超高層群體建筑基礎(chǔ)階段現(xiàn)場(chǎng)平面布置中,逐漸開始采用綜合施工技術(shù)進(jìn)行施工,這一施工技術(shù)的應(yīng)用,在一定程度上保障了超高層群體建筑施工的整體質(zhì)量,有效的保障了超高層群體建筑施工的順利開展。
1 工程概況
某超高層群體建筑施工工程位于某市的中心區(qū)域,這一區(qū)域由于位于市中心,已經(jīng)被市里劃分為核心區(qū)域,在這一區(qū)域內(nèi),建設(shè)了3座辦公樓,在這三棟辦公樓之間,還建設(shè)由獨(dú)立的裙房,這一工程的總體占地面積達(dá)到了29053.56m2,工程的總體面積占到了284251.23m2,其中第一棟樓辦公樓的辦公面積就達(dá)到了35365.23m2,第二棟建筑的辦公面積達(dá)到了76892.32m2,而第三棟辦公樓的辦公面積則也為76892.32m2,這三棟建筑的辦公面積均只包含地上辦公的面積,其中第一棟建筑的總樓層數(shù)為26層,地下2層,而地上24層,以結(jié)構(gòu)頂板為基準(zhǔn),這一建筑的總體高度為93.50m,采用的結(jié)構(gòu)為鋼筋混凝土框架-核心筒混合結(jié)構(gòu)形式。而第二棟建筑的總樓層數(shù)為40層,其中地下2層,地上38層,也是以結(jié)構(gòu)頂板為參照物,建筑的整體高度為150.3m,這棟建筑采用的結(jié)構(gòu)形式主要為型鋼混凝土框架-鋼筋混凝土筒體結(jié)構(gòu)。
2 超高層群體建筑基礎(chǔ)階段現(xiàn)場(chǎng)平面布置中存在的問題及解決措施
2.1 存在的問題
該工程在基礎(chǔ)施工階段,其所能夠利用的施工場(chǎng)地相對(duì)較小,而該建筑的建筑規(guī)模較大,占地面積也相對(duì)較大,在基礎(chǔ)施工階段,所預(yù)留出的道路寬度僅為11m,并不能夠滿足大型機(jī)械運(yùn)行的要求。而在其南側(cè)以及西側(cè)面的道路,寬度僅僅只有5m,根本無法運(yùn)行大型機(jī)械。而在東側(cè)的道路,11m的道路寬度,還需要與其他的建筑物共同使用,而在北側(cè)的道路,雖然也有11m,到那時(shí)在道路上還設(shè)置了一個(gè)排水溝,該排水溝主要是為了保障基坑能夠有效的進(jìn)行排水。而南側(cè)與西側(cè)的道路不僅要用來進(jìn)行材料的堆放,還要搭建辦公室以及設(shè)置消防水箱,所以預(yù)留的空隙只有1m。
這樣狹小的施工現(xiàn)場(chǎng),使得基礎(chǔ)施工階段面臨著眾多的難題,主要表現(xiàn)在:該工程的總面積在28萬m2以上,屬于超高層群體建筑,這一建筑在基礎(chǔ)施工階段,對(duì)于施工現(xiàn)場(chǎng)的平面布置具有較高的要求,而建筑施工場(chǎng)地的狹小,使得施工現(xiàn)場(chǎng)的平面布置受到了極大的影響,各種物料的堆放成為了難題,相關(guān)設(shè)備的進(jìn)入也變得更加的困難,僅存的場(chǎng)地布置受到了很大的限制,無法有效的保障現(xiàn)場(chǎng)施工的順利進(jìn)行,使得現(xiàn)場(chǎng)施工的要求無法得到滿足,基坑場(chǎng)地的設(shè)置出現(xiàn)了困難,要想使得該問題得到解決,就需要針對(duì)建筑施工現(xiàn)場(chǎng)的整體情況做到全面的了解,并對(duì)施工現(xiàn)狀進(jìn)行更為深入的剖析,對(duì)現(xiàn)場(chǎng)中的各個(gè)物件進(jìn)行合理的分配,將物料堆放在適宜的位置,制定出科學(xué)的施工方案,依據(jù)施工方案中的具體要求來對(duì)平面空間進(jìn)行安排,充分的利用一切的空間條件,有效的解決場(chǎng)地狹小問題,從而使得大型機(jī)械能夠順利的進(jìn)入到現(xiàn)場(chǎng)中,從而保障施工的順利展開。
2.2 采取的有效措施
通過勘察報(bào)告和現(xiàn)場(chǎng)了解場(chǎng)地及周邊的地質(zhì)條件、氣候環(huán)境,尋找施工現(xiàn)場(chǎng)可利用空間,經(jīng)過多次勘察與研究不但充分利用了施工場(chǎng)地原有的平面空間,而且采取一些搭設(shè)、鋪裝等手段充分的把豎向空間也得以充分利用,挖掘施工現(xiàn)場(chǎng)每一個(gè)可利用角落。具體做法有利用基坑預(yù)留土坡平臺(tái)及護(hù)坡樁冠梁上方空間搭設(shè)物料平臺(tái)架、修筑重型道路;基坑內(nèi)預(yù)留土方平臺(tái);基坑內(nèi)加厚墊層厚度作為物料加工場(chǎng)。所有搭設(shè)平臺(tái)均經(jīng)過計(jì)算合格并經(jīng)業(yè)主、監(jiān)理驗(yàn)收后方才投入使用,并有專人定期檢查與保養(yǎng)。利用基坑預(yù)留土坡平臺(tái)及護(hù)坡樁冠梁上方空間搭設(shè)物料平臺(tái)架;結(jié)合結(jié)構(gòu)形式及附近周邊情況、工程實(shí)際特點(diǎn),堆積加工材料比較困難,為了方便施工,搭設(shè)落地式的扣件式多排鋼管平臺(tái)架,基坑?xùn)|側(cè)、南側(cè)、北側(cè)共搭設(shè)物料堆放平臺(tái)近1000m2,解決了第一棟建筑、第二棟建筑鋼筋料場(chǎng)、加工場(chǎng)及模板堆放場(chǎng)地問題。平臺(tái)基礎(chǔ)利用基坑內(nèi)預(yù)留土坡平臺(tái),表面用C15砼進(jìn)行硬化,厚度為10cm。所有的基礎(chǔ)必須平整。
基坑南側(cè)利用護(hù)坡樁冠梁頂部空間修筑一條5.7m寬、150m長道路,作為鋼構(gòu)卸車、澆筑砼專用道路,此條道路特別是對(duì)第二座建筑西棟起到關(guān)鍵作用,第二座建筑西棟位于西南側(cè),東側(cè)為第二座建筑東棟,西北側(cè)為第一棟建筑,夾在中間的第二座建筑所有的機(jī)械、材料只能靠這條重型道路;專用道路長91.3m,寬5.7m,道路向圍墻處找2%坡,圍墻開200×200過水洞間距20m,道路雨水由過水洞排向場(chǎng)外。利用護(hù)坡樁冠梁頂部空間,砌筑擋土墻回填中砂分層振搗密實(shí),澆筑200厚鋼筋砼路面。240厚磚砌擋土墻采用1:3水泥砂漿砌筑,設(shè)240×200@3000鋼筋砼構(gòu)造柱,擋土墻頂部設(shè)240×200鋼筋砼圈梁。構(gòu)造柱主筋與冠梁連接采用化學(xué)植筋,錨固長度15d。
配筋:路面下鐵¢12@200上鐵¢8@200(僅邊坡外3m范圍設(shè)鋼筋),構(gòu)造柱:4¢12/¢8@250,圈梁:4¢12/¢8@250?;炷翉?qiáng)度等級(jí):C20。護(hù)欄:護(hù)欄高1500,砼圈梁預(yù)埋400長¢20@200鋼筋頭,護(hù)欄采用¢48×3.5@2000鋼管立柱與鋼筋頭單面搭接焊10d,護(hù)欄上、中、下設(shè)三道橫桿,外側(cè)滿掛一道鋼絲網(wǎng)和一道密目網(wǎng)。沿護(hù)欄砌筑240寬200高擋水臺(tái),擋水臺(tái)采用1:3水泥砂漿砌筑,外抹20厚1:3水泥砂漿?;禹敳窟吘€外側(cè)兩米范圍內(nèi)不得加載,兩米范圍外加載不得超過40kN/m2,加載時(shí)盡量靠近基坑外側(cè)布置。
結(jié)束語
綜上所述,超高層群體建筑在施工的過程中,往往會(huì)面臨施工場(chǎng)地狹小的問題,而超高層群體建筑無論是在占地面積上還是在建筑規(guī)模上都相對(duì)較大,施工中需要應(yīng)用到的機(jī)械設(shè)備以及材料也相對(duì)較多,施工場(chǎng)地狹小,會(huì)使得基礎(chǔ)階段現(xiàn)場(chǎng)的平面布置出現(xiàn)混亂的局面,要想有效的解決這種問題,就需要合理的利用綜合施工技術(shù),充分的利用一切空調(diào)條件,解決施工現(xiàn)場(chǎng)場(chǎng)地狹小的問題,保障施工的順利開展,從而提升超高層群體建筑的整體經(jīng)濟(jì)效益。
參考文獻(xiàn)
[1]閆祥梅,李永明.河南廣播電視發(fā)射塔井道鋼柱與鋼梁施工技術(shù)[J].施工技術(shù),2012(3).
doi:10.3969/j.issn.1007-614x.2010.18.258
臨床資料
2006年初南華縣民政局制定了《南華縣民政局關(guān)于對(duì)PLHA及家庭成員的救助辦法》及確定了救助對(duì)象和標(biāo)準(zhǔn)。對(duì)符合農(nóng)業(yè)和非農(nóng)戶口困難條件的PLHA及家庭實(shí)施生活救助,并按救助標(biāo)準(zhǔn)執(zhí)行,救助的范圍是南華縣轄區(qū)的PLHA、家庭成員、艾滋病遺孤。
簡化關(guān)懷救助手續(xù),由疾控中心的工作人員落實(shí)關(guān)懷救助工作。具體方法是困難的PLHA、家庭成員、艾滋病遺孤向南華縣疾控中心提出申請(qǐng),經(jīng)縣疾控中心負(fù)責(zé)審核其身份及家庭狀況后寫出申請(qǐng),注明符合救助條件的人數(shù)、屬于農(nóng)業(yè)人口或非農(nóng)業(yè)人口數(shù)(注:不需要提供姓名)申請(qǐng)報(bào)縣防艾辦主任簽字蓋章,轉(zhuǎn)縣民政局核實(shí)審批后,縣民政局將救助金轉(zhuǎn)到專為救助對(duì)象開設(shè)的銀行賬戶上,疾控中心工作人員讓PLHA簽字蓋章或按手印后,以實(shí)名登記名冊(cè)發(fā)放救助金。民政局不再做村、鄉(xiāng)、鎮(zhèn)縣的逐級(jí)審批及公示。
南華縣疾控制中心PLHA互助平臺(tái)――愛心家園每月開展1次活動(dòng),愛心家園的主要活動(dòng)有PLHA家庭護(hù)理和各種知識(shí)及生活技能培訓(xùn);家庭對(duì)PLHA的重要性倡導(dǎo);如何面對(duì)社會(huì)歧視問題;如何制定生活目標(biāo)并遵行符合健康和道德的行為規(guī)范;民政救助最低生活保障金的申請(qǐng)和辦理及防艾綜合管理工作的服務(wù)等。縣防艾辦和縣民政局聯(lián)合每季度對(duì)縣疾控中心作督導(dǎo)檢查。
結(jié) 果
關(guān)懷救助工作簡化程序,減少中間環(huán)節(jié),最大限度實(shí)現(xiàn)保密。解除了PLHA的心理顧慮和壓力;影響他們對(duì)AIDS的態(tài)度、信念;減少了AIDS對(duì)個(gè)人、家庭及社會(huì)經(jīng)濟(jì)發(fā)展的不良影響。
圓滿落實(shí)了關(guān)懷救助政策,到2009年底為止(在本地隨訪管理的53例)有45例符合關(guān)懷救助的PLHA和其中14例PLHA家屬得到民政救助,共發(fā)救助金3.5萬余元。有3例HIV感染者在縣內(nèi)企事業(yè)單位打工為生,有5例HIV感染者從事生產(chǎn)勞動(dòng)。防艾部門加強(qiáng)宣傳,減少社會(huì)歧視,從社會(huì)各方面籌集關(guān)懷救助物資,投入1萬余元用于愛心家園活動(dòng)經(jīng)費(fèi)開支和購置毛毯、被子,農(nóng)牧養(yǎng)殖及種植科技推廣手冊(cè)等發(fā)放給PLHA手中。
PLHA的綜合管理指標(biāo)取得好成績。2006年以來綜合管理指標(biāo)逐漸上升,2009年全縣新報(bào)告感染者/患者首次隨訪率、CD4細(xì)胞檢測(cè)率、配偶檢測(cè)率均達(dá)到100%。
PLHA的關(guān)懷救助和綜合管理工作雙管齊下,兩者相互促進(jìn),取得雙贏的效果。PLHA與疾控機(jī)構(gòu)工作人員的距離拉近了,建立起良好的依從性;母嬰阻斷、抗病毒治療等防艾工作也較好的完成。
綜合布線施工技術(shù)是在計(jì)算機(jī)信息技術(shù)的不斷發(fā)展推動(dòng)下形成的,這是一種具有很大先進(jìn)性的建筑工程布線施工方法,其是利用語音、數(shù)據(jù)以及圖像、視頻等信息的傳遞與交換,來實(shí)現(xiàn)建筑內(nèi)部的信息共享,從而達(dá)到建筑與建筑或建筑內(nèi)部之間的信息化管理,是促進(jìn)建筑實(shí)現(xiàn)辦公自動(dòng)化的有效途徑。在我國當(dāng)前的醫(yī)院基礎(chǔ)建設(shè)中,對(duì)于布線的施工還是采用較為傳統(tǒng)的方式,遠(yuǎn)遠(yuǎn)不能滿足現(xiàn)代醫(yī)院的信息共享需求。為此,必須要對(duì)醫(yī)院進(jìn)行全面的綜合布線施工,以提高醫(yī)院的自動(dòng)化管理水平,促進(jìn)醫(yī)療業(yè)務(wù)的更好開展。而要確保綜合布線的施工效果,就需要加強(qiáng)施工管理,確保每個(gè)施工環(huán)節(jié)都是按照綜合布線的施工設(shè)計(jì)要求進(jìn)行安裝作業(yè)。
1.綜合布線施工準(zhǔn)備階段的施工管理
無論是在醫(yī)院改建或是新建的綜合布線施工中,都必須要做好相應(yīng)的準(zhǔn)備工作。與新建醫(yī)院的綜合布線施工相比,醫(yī)院改建綜合布線施工的準(zhǔn)備工作還包括對(duì)原有布線方式的全面了解,以便在設(shè)計(jì)中合理運(yùn)用原有布線,減少施工成本。但總體來講,在施工準(zhǔn)備階段,都必須要做好以下幾點(diǎn)施工管理工作:
1.1熟悉相關(guān)資料,做好施工方案設(shè)計(jì)
在開始改建或新建綜合布線施工之前,必須要對(duì)相關(guān)的資料進(jìn)行全面的掌握與熟悉,如醫(yī)院對(duì)綜合布線的設(shè)計(jì)要求、所需施工材料性能、質(zhì)量驗(yàn)收標(biāo)準(zhǔn)以及其他資料等。同時(shí)要在保證滿足醫(yī)院布線需求的基礎(chǔ)上,進(jìn)行合理的施工方案設(shè)計(jì),并做好施工組織規(guī)劃,合理安排綜合布線的施工進(jìn)度。對(duì)于已經(jīng)在運(yùn)行的醫(yī)院,要保證施工不會(huì)影響到醫(yī)院的正常運(yùn)營;而對(duì)于新建的醫(yī)院來講,要與土建專業(yè)施工做好協(xié)調(diào)管理,使兩者之間的交叉施工不互相影響,保證醫(yī)院建筑的施工質(zhì)量和綜合布線施工效果。
1.2布置臨時(shí)設(shè)施
施工管理過程中要考慮綜合布線方面的實(shí)際操作性,因?yàn)楹芏嗍┕?chǎng)地不盡相同,所以要考慮實(shí)際情況進(jìn)行臨時(shí)性設(shè)施和場(chǎng)地方面的搭建來保證工作的順利進(jìn)行。就拿管槽的施工來說,管槽的加工場(chǎng)必須要結(jié)合實(shí)際情況而定,在進(jìn)行搭建加工場(chǎng)的時(shí)候要考慮到它的位置以及規(guī)模等因素,這些因素直接關(guān)系著施工的順利進(jìn)行。再比如因?yàn)椴季€施工往往涉及到很多施工材料,這些材料的存放和搬運(yùn)都要便于施工,所以搭建臨時(shí)性倉庫就顯得非常重要,臨時(shí)倉庫的選址以及搭建規(guī)模都要根據(jù)施工需要而定。還有就是要考慮現(xiàn)場(chǎng)施工管理所需要的辦公地點(diǎn),只有將地點(diǎn)的位置設(shè)定的更為合理才能便于管理人員進(jìn)行日常的工作。
2.綜合布線工程施工中的施工管理
綜合布線工作是工程建設(shè)施工中的重要環(huán)節(jié),因?yàn)樯婕暗姆秶约皯?yīng)用的技術(shù)手段多種多樣,所以要進(jìn)行統(tǒng)一協(xié)調(diào)才能讓管理工作順利開展,才能保障施工的圓滿完成。對(duì)于布線施工來說,施工的條件以及整個(gè)施工協(xié)調(diào)系統(tǒng)的順利運(yùn)行都直接關(guān)乎著施工質(zhì)量。只有讓各個(gè)環(huán)節(jié)和部門都能夠在施工管理調(diào)控下協(xié)調(diào)運(yùn)作才能讓工程質(zhì)量和工程進(jìn)度達(dá)到預(yù)期的目標(biāo)。我們針對(duì)施工過程中的幾個(gè)重點(diǎn)環(huán)節(jié)采取的措施如下:
2.1設(shè)備間
綜合布線施工與建筑工程主體之間有著緊密的聯(lián)系,因而電氣工程師應(yīng)與土建部門進(jìn)行充分的溝通協(xié)調(diào),例如,施工中一般將建筑中專用的弱電豎井作為每個(gè)樓層的設(shè)備間,由于施工設(shè)計(jì)中往往不會(huì)對(duì)施工環(huán)境加以詳細(xì)的說明,實(shí)際施工中又常常要面對(duì)墻面粗糙、室內(nèi)陰暗、環(huán)境潮濕等問題,因而設(shè)備間施工中應(yīng)全面考慮防火、防潮、通風(fēng)等問題。電氣施工前要向建筑施工部門提出明確的要求,保證墻面粉平刷白、安裝防火門、保持通風(fēng)干燥,穿過樓板的鋼管和金屬線槽洞口要做好防火密封,以保證建筑弱點(diǎn)系統(tǒng)有一個(gè)良好的運(yùn)行環(huán)境。
2.2系統(tǒng)接地
接地是否可靠直接影響著系統(tǒng)運(yùn)行的安全性和穩(wěn)定性。因而應(yīng)對(duì)系統(tǒng)接地尤其重視,而綜合布線項(xiàng)目施工中,不論是電氣工程師還是施工管理部門,對(duì)系統(tǒng)接地環(huán)節(jié)的重視往往不足,造成施工不到位,接地不可靠。
接地系統(tǒng)施工管理中,應(yīng)尤其注意:不論是以建筑物柱內(nèi)主鋼筋作為母線接地,還是在另外敷設(shè)銅排等作為接地母線,每層配線設(shè)備間都應(yīng)預(yù)留專用地端子,不得遺漏,施工完成后還要進(jìn)行測(cè)試,保證連通可靠性。除此之外,任何與綜合布線系統(tǒng)有關(guān)的設(shè)備都應(yīng)進(jìn)行可靠接地,且不同設(shè)備的接地最好采取聯(lián)合接地的方式,將不同裝置設(shè)備連接于統(tǒng)一接地體,如果必須采用多個(gè)接地體時(shí),接地體之間的電位差不得大于1Vr.m.s。
2.3線纜敷設(shè)
首先,線纜敷設(shè)前要檢查各種線纜的規(guī)格、形式是否與設(shè)計(jì)要求相符,符合設(shè)計(jì)要求和技術(shù)規(guī)程的線纜方可投入施工;其次,敷設(shè)線纜過程中,應(yīng)保持線纜的平直,不得使線纜糾結(jié)、打圈、更不能讓線纜受到外力的扭曲和擠壓以免造成線纜損壞。
2.4電源配置
首先,重要機(jī)房要設(shè)置專用的雙電源切換裝置,以保證綜合布線系統(tǒng)的穩(wěn)定運(yùn)行;其次,為了保證操作環(huán)境光線充足,應(yīng)設(shè)置應(yīng)急照明裝置,照明度應(yīng)高于0.5LX;每個(gè)配線設(shè)備間應(yīng)配置兩個(gè)以上的220V/10A的5孔插座,以備交換使用;除此之外,應(yīng)對(duì)房間的信息插座高度進(jìn)行合理設(shè)置,充分考慮靜電地板的影響。
3.總結(jié)
隨著建筑智能化技術(shù)的不斷發(fā)展,以及各種新材料、新設(shè)備的涌現(xiàn),人們對(duì)智能建筑集成化的要求將不斷提高。而綜合布線施工涉及面廣,影響因素多,而綜合布線施工又難免要與土建施工交叉進(jìn)行。因而要控制好綜合布線工程的施工質(zhì)量,不但要充分熟悉綜合布線系統(tǒng)施工要求、設(shè)計(jì)意圖,做好施工現(xiàn)場(chǎng)管理,規(guī)范施工操作,嚴(yán)格驗(yàn)收監(jiān)測(cè),還要與土建部門進(jìn)行及時(shí)的溝通協(xié)調(diào),以保證綜合布線系統(tǒng)運(yùn)行穩(wěn)定、可靠。
【參考文獻(xiàn)】
綜合布線技術(shù)是一門新發(fā)展起來的工程技術(shù),涉及智能建筑和計(jì)算機(jī)網(wǎng)絡(luò)技術(shù)等多個(gè)領(lǐng)域,有線通信工程、光纖通信技術(shù)專業(yè)學(xué)生崗位任職能力課程體系的組成部分?,F(xiàn)今,人們的生活也已經(jīng)離不開計(jì)算機(jī)網(wǎng)絡(luò)了。企業(yè)也急需大批能夠完成綜合布線規(guī)劃設(shè)計(jì)、安裝施工、測(cè)試驗(yàn)收和維護(hù)管理等工作的專業(yè)人員,滿足行業(yè)對(duì)技能型人才的需求。但目前高職院校綜合布線課程的教學(xué)與企業(yè)的用人需求還存在較大差距,以下是筆者對(duì)綜合布線課程教學(xué)改革的一些認(rèn)識(shí)。
1綜合布線課程教學(xué)現(xiàn)狀
綜合布線課程是一門理論和實(shí)踐緊密結(jié)合的課程,要求學(xué)生不但要掌握扎實(shí)的理論基礎(chǔ),還要掌握嫻熟的現(xiàn)場(chǎng)施工技能。但目前綜合布線課程的教學(xué)中還存在一系列的問題,主要體現(xiàn)在以下幾個(gè)方面。
1.1理論與實(shí)踐脫節(jié)
綜合布線課程中涉及的理論部分,知識(shí)面廣、內(nèi)容多,這些內(nèi)容基本上又都是綜合布線的國家標(biāo)準(zhǔn)或是行業(yè)標(biāo)準(zhǔn),必須嚴(yán)格執(zhí)行。學(xué)生在學(xué)習(xí)的過程中需將這些理論與實(shí)踐結(jié)合起來,在豐富理論知識(shí)的基礎(chǔ)上去完成實(shí)踐活動(dòng)。目前在教學(xué)過程中,主要采取的教學(xué)方法是先集中講授理論知識(shí),再進(jìn)行實(shí)訓(xùn),這樣的教學(xué)方法造成了理論與實(shí)踐的嚴(yán)重脫節(jié),學(xué)生對(duì)授課理論知識(shí)沒有直觀感受,完全提不起興趣。另一方面,學(xué)生不能深入理解理論知識(shí),又會(huì)造成理論應(yīng)用干實(shí)踐能力的不足。用人單位會(huì)覺得學(xué)生能力薄弱,即缺乏理論知識(shí),不滿足實(shí)際工程項(xiàng)目的要求;又缺乏施工技能,不能完成工程項(xiàng)目中的實(shí)際施工。
1.2課程學(xué)時(shí)分配不合理,重點(diǎn)難以突出
綜合布線課程的特點(diǎn)是理論與實(shí)踐的緊密集合。如果單純突出理論教學(xué),減少實(shí)踐學(xué)時(shí),學(xué)生在學(xué)習(xí)時(shí)難以形成對(duì)知識(shí)的深刻認(rèn)識(shí),只能死記硬背,效率低下,也難以將理論應(yīng)用干實(shí)際工程,還會(huì)造成施工技能水平的下降,難以滿足企業(yè)對(duì)學(xué)生職業(yè)技能的要求。如果單純的突出實(shí)踐,減少理論學(xué)時(shí),又會(huì)造成學(xué)生只會(huì)技術(shù)卻不懂設(shè)計(jì),成為普通的技術(shù)工人,不利于學(xué)生以后的職業(yè)發(fā)展。
1.3實(shí)踐環(huán)節(jié)與滿足實(shí)際工程間存在巨大差距
綜合布線課程的實(shí)踐環(huán)節(jié)主要存在以下幾個(gè)問題,首先的是實(shí)踐場(chǎng)所和實(shí)驗(yàn)設(shè)備不夠完善,綜合布線課程實(shí)踐項(xiàng)目多,對(duì)場(chǎng)地和工具、設(shè)備的要求復(fù)雜。其次是實(shí)踐項(xiàng)目只能滿足學(xué)生基本工程施工技能的培養(yǎng),與實(shí)際的工程項(xiàng)目施工技能要求差距巨大,不但缺乏職業(yè)素養(yǎng)的培養(yǎng),實(shí)踐的模擬環(huán)境也與實(shí)際工程存在較大的不同,不能獲得實(shí)際的工作經(jīng)驗(yàn)和施工技能,無法滿足用人單位的要求。最后就是綜合布線課程實(shí)踐項(xiàng)目的運(yùn)行成本較高,為了保證學(xué)生能夠?qū)寄苣軌蚴炀氄莆?,往往需要進(jìn)行多次的實(shí)踐訓(xùn)練,耗材花費(fèi)比較大。
2綜合布線課程的教學(xué)改革
2.1理論與實(shí)踐的緊密結(jié)合
綜合布線課程需要理論與實(shí)踐緊密結(jié)合,如何配置二者之間的授課比例對(duì)教學(xué)效果有很大的影響,綜合布線課程的原有理論教學(xué)包含了綜合布線的系統(tǒng)組成與結(jié)構(gòu)涉及各類標(biāo)準(zhǔn)與各種連接器件和線纜,以及規(guī)劃設(shè)計(jì)、施工技術(shù)、項(xiàng)目測(cè)試與驗(yàn)收等諸多內(nèi)容,如果全部通過理論課來講解,學(xué)習(xí)不僅枯燥無味,也無法理解理論如何應(yīng)用到實(shí)際工程中。理論與實(shí)踐的緊密結(jié)合應(yīng)該是學(xué)生更多的是應(yīng)該通過實(shí)踐來掌握理論知識(shí),從實(shí)踐項(xiàng)目中去完成對(duì)理論細(xì)節(jié)部分的理解和鞏固。目前課程的理論、實(shí)踐比例為1:2,減少理論教學(xué),突出實(shí)踐。
2.2基于項(xiàng)目小組的實(shí)踐教學(xué)
在實(shí)際的網(wǎng)絡(luò)工程和綜合布線工程中,項(xiàng)目的實(shí)施都不是一個(gè)人完成的,任何項(xiàng)目工程都必須與他人分工協(xié)作才能實(shí)現(xiàn)。小組作為一個(gè)整體,需共同應(yīng)對(duì)出現(xiàn)的問題,合理的安排組員間的分工,并及時(shí)對(duì)問題進(jìn)行總結(jié)與反思。項(xiàng)目小組的教學(xué)方式除了可以訓(xùn)練學(xué)生的工程施工技能,還可以鍛煉學(xué)生的組織、溝通、協(xié)作的能力。
2.3貼近實(shí)際工程的實(shí)踐教學(xué),加強(qiáng)職業(yè)素養(yǎng)訓(xùn)練
實(shí)踐教學(xué)的目的就是為了培養(yǎng)學(xué)生能夠適應(yīng)和滿足綜合布線工程施工的要求。因此,學(xué)生在綜合布線實(shí)踐過程中,應(yīng)按照實(shí)際工程的要求來進(jìn)行,從細(xì)節(jié)抓起,從最基本的職業(yè)技能素養(yǎng)人手。例如:在項(xiàng)目小組進(jìn)行項(xiàng)目實(shí)施前,應(yīng)首先認(rèn)真閱讀并小組討論實(shí)踐內(nèi)容和要求,充分理解的基礎(chǔ)上才能進(jìn)行施工。線纜、線管等耗材和工具使用應(yīng)進(jìn)行登記記錄,使用完畢之后應(yīng)進(jìn)行整理歸位等等。只有按照實(shí)際工程的要求去完成實(shí)踐項(xiàng)目,才能培養(yǎng)出滿足企業(yè)的技能要求的學(xué)生。
2.4校企合作,企業(yè)工程師參與實(shí)踐教學(xué)
學(xué)校在充分發(fā)展校內(nèi)實(shí)訓(xùn)場(chǎng)所的同時(shí),更需要加強(qiáng)與校外企業(yè)的合作,積極拓展校外實(shí)訓(xùn)基地。通過與企業(yè)的合作可以將市場(chǎng)上最新的技術(shù)引入學(xué)校,能幫助學(xué)生進(jìn)一步掌握企業(yè)所要求的專業(yè)知識(shí)和技能,也能夠幫助學(xué)生更好的了解將來的工作崗位,滿足社會(huì)的需求。在實(shí)踐教學(xué)中,也應(yīng)充分利用校企合作的優(yōu)勢(shì),企業(yè)工程師在實(shí)際工程項(xiàng)目中有著更豐富的一線工程經(jīng)驗(yàn),在實(shí)踐教學(xué)中,可以讓企業(yè)工程師承擔(dān)部分教學(xué)工作,學(xué)生可以深入了解實(shí)際工程項(xiàng)目是如何進(jìn)行設(shè)計(jì)和施工。
2.5注重平時(shí)、淡化記憶的考核方式
綜合布線課程要求學(xué)生掌握熟練的工程施工技能,因此,在考核方式上應(yīng)采取對(duì)學(xué)生平時(shí)工程施工技能水平和工程施工質(zhì)量進(jìn)行考核為主。在理論考核上,可以采取開卷的形式進(jìn)行,盡量淡化學(xué)生對(duì)理論的記憶,突出學(xué)生對(duì)理論的理解和應(yīng)用的考核。
3結(jié)語
隨著信息技術(shù)的不斷發(fā)展,綜合布線人才市場(chǎng)的需求也會(huì)越來越大,通過網(wǎng)絡(luò)綜合布線課程的教學(xué)改革,不斷提高教學(xué)質(zhì)量,把學(xué)生培養(yǎng)成為能夠進(jìn)行綜合布線方案設(shè)計(jì)、施工、驗(yàn)收及維護(hù)的全面型人才,滿足社會(huì)和用人單位對(duì)綜合布線工程項(xiàng)目實(shí)施的要求。
參考文獻(xiàn):
[1]王公儒.綜合布線工程實(shí)用技術(shù)[M].北京:中國鐵道出版社,2011.
[2]鄭少華.職校網(wǎng)絡(luò)綜合布線課程教學(xué)改革探究[J].職業(yè),2012(9):l63―164.
1工程概況
蘇里格氣田天然氣處理廠占地面積大,工期短,施工壓力大。其中埋地公用管道包含消防系統(tǒng)管道、采暖管道、給排水管道、燃?xì)夤艿赖?,施工一般與其他工序交叉進(jìn)行,各道工序相互影響極大,嚴(yán)重影響工期計(jì)劃。
2管線綜合布線技術(shù)的優(yōu)越性
管道綜合布線施工技術(shù)(以后簡稱綜合布線技術(shù))是利用全站儀精確定位,水準(zhǔn)儀標(biāo)高控制,進(jìn)行埋地公用管道施工的新技術(shù)。綜合布線技術(shù)是在場(chǎng)地平整完成后,各專業(yè)施工前,臨時(shí)水管線、臨時(shí)用電線路敷設(shè)施工期間,同時(shí)進(jìn)行埋地公用管道施工的新型施工措施。一般情況下,在大型場(chǎng)站施工過程中,埋地管道施工與其他施工作業(yè)同步進(jìn)行。施工過程中各專業(yè)、各工序相互交叉,相互影響。在后續(xù)施工過程中有可能出現(xiàn)管架基礎(chǔ)、電纜溝、重力流排水管線、閥門井、某些大型設(shè)備基礎(chǔ)等的位置與已施工完的埋地公用管道位置沖突,或者出現(xiàn)后期管架基礎(chǔ)、電纜溝、重力流排水管線、閥門井、某些大型設(shè)備基礎(chǔ)等施工空間不夠,造成埋地公用管道的返工,嚴(yán)重影響工期計(jì)劃并極易造成疏漏及錯(cuò)誤。
通過對(duì)以往三個(gè)天然氣處理廠施工過程中管線交叉影響問題的不斷總結(jié)、分析、歸納、探索,我們制定了埋地公用管道施工綜合布線技術(shù)方案,并運(yùn)用于指導(dǎo)蘇里格氣田第五天然氣處理廠埋地公用管道施工中,最終取得好了很好的技術(shù)效果,大大降低了交叉施工導(dǎo)致的錯(cuò)誤率;爭(zhēng)取到很大的時(shí)間效益,極大地提高了施工效率,避免了返工,縮短了工期。
我們總結(jié)歸納的大型場(chǎng)站埋地公用管道施工中常見問題如下:
3埋地管道綜合布線施工技術(shù)
管線綜合布線施工技術(shù)需要在圖紙會(huì)審階段,組織不同專業(yè)相關(guān)審圖人員及時(shí)對(duì)接,在審圖發(fā)現(xiàn)圖紙問題的同時(shí)還要理清所有埋地公用管線的位置及標(biāo)高,把埋地公用管道繪制在一張CAD圖紙上,并在圖紙上畫出埋地公用管道附屬構(gòu)筑物和重要的構(gòu)筑物及設(shè)備基礎(chǔ),避免在管架基礎(chǔ)、電纜溝、設(shè)備基礎(chǔ)、水池等的施工中與埋地公用管道發(fā)生位置沖突或者后續(xù)的施工對(duì)己施工的埋地公用管道造成成品破壞。
在蘇里格氣田第五天然氣處理廠我們采用了埋地公用管道綜合布線施工技術(shù)進(jìn)行試驗(yàn),使埋地公用管道施3232期大大縮短了,同時(shí)也減少了與相關(guān)專業(yè)的交叉作業(yè)。4埋地公用管道綜合布線施工技術(shù)關(guān)鍵
4.1施工前技術(shù)準(zhǔn)備
埋地公用管道綜合布線施工技術(shù)需要按以下幾個(gè)方面。
(1)埋地公用管道綜合布線施工技術(shù)要求首先要根據(jù)相關(guān)專業(yè)圖紙繪制出全廠埋地管道A、B向管道布線表。
(2)對(duì)埋地管道A、B向管道布線表進(jìn)行數(shù)據(jù)分析,發(fā)現(xiàn)表中存在問題,及時(shí)與設(shè)計(jì)方相互溝通進(jìn)行解決。在進(jìn)行埋地管道布線表數(shù)據(jù)分析過程中要遵守以下幾個(gè)原則:
①管道避讓原則,通常情況下小管線避讓大管線,動(dòng)力流管線避讓重力流管線,鋼質(zhì)管線避讓塑料管線,管線避讓設(shè)備基礎(chǔ)、構(gòu)筑物等的原則;
②管道標(biāo)高控制原則,在施工過程中使用水準(zhǔn)儀嚴(yán)格控制管線埋深,避免管線埋深不足或埋深過深現(xiàn)象發(fā)生;
③多條埋地管線一次開挖完成施工原則,能一次施工的多條管線一次施工完畢,避免二次開挖破壞已施工埋地管線,造成隱患。通過對(duì)表格數(shù)據(jù)的分析,確定出用于指導(dǎo)埋地公用管道施工的最終A、B向管道布線表。
4.2測(cè)量放線與標(biāo)高復(fù)測(cè)控制
在每條管線施工前,使用全站儀精確定位,使用白灰灑出管線走向,白灰線lm外進(jìn)行管線布管組焊,組焊完成后沿著白灰線進(jìn)行管溝開挖,防止管線實(shí)際位置與圖紙?jiān)O(shè)計(jì)位置不符,邊開挖邊進(jìn)行管溝深度測(cè)量,防止因管溝開挖過深造成管線埋深增加現(xiàn)象的發(fā)生。管線下溝后進(jìn)行管線位置復(fù)測(cè),如果是多條管線同溝敷設(shè)還要進(jìn)行管線間距測(cè)量,符合規(guī)范要求后方可報(bào)監(jiān)檢驗(yàn),檢驗(yàn)合格方可進(jìn)行管溝回填。管線留頭處在溝回填前復(fù)測(cè)管線留頭處坐標(biāo)和標(biāo)高,做好相關(guān)記錄,為以后管線連頭時(shí)尋找管頭減少工作量。
4.3施工過程中現(xiàn)場(chǎng)關(guān)鍵
管道綜合布線現(xiàn)場(chǎng)施工時(shí)需注意以下幾項(xiàng):
(1)施工前需清楚材料到貨情況,根據(jù)現(xiàn)有材料清單,盡可能多完成埋地管道施工。充分利用開挖管溝,在保證管道間距的情況下盡可能同溝敷設(shè)埋地管道,減少管溝開挖次數(shù)。
(2)根據(jù)材料清單,先進(jìn)行埋深較深管線施工,以免造成對(duì)已完管線的二次破壞。
(3)對(duì)于距離建筑物、大型設(shè)備基礎(chǔ)、水池較近的埋地管道在完成建筑物、大型設(shè)備基礎(chǔ)、水池施工后再進(jìn)行相關(guān)部位的埋地管道施工。因?yàn)榻ㄖ?、大型設(shè)備基礎(chǔ)、水池基坑開挖較深需要放坡,可能造成已建管道懸空變形或者破壞已建管道,所以靠近建筑物、大型設(shè)備基礎(chǔ)、水池管道需待建筑物、大型設(shè)備基礎(chǔ)、水池地下部位施工完畢后再進(jìn)行埋地管道部分的施工。
2綜合布線系統(tǒng)的構(gòu)成
由于該系統(tǒng)能夠滿足語音、視頻和通訊等多種需求,因此,它的結(jié)構(gòu)是開放式的星型拓?fù)浣Y(jié)構(gòu)。首先,工作區(qū)。每一個(gè)工作區(qū)中都應(yīng)該包含一個(gè)終端設(shè)備,該設(shè)備獨(dú)立存在,只有進(jìn)行手動(dòng)設(shè)置才能夠開始工作。適配器和連接電纜存在于該區(qū)域中的終端設(shè)備處,這兩種設(shè)備再加上信息插座是構(gòu)成工作區(qū)的基本設(shè)施;其次,配線子系統(tǒng)。該系統(tǒng)的組成部分有相應(yīng)的配線設(shè)備、跳線和工作區(qū)中的信息插座。綜合布線系統(tǒng)自身是存在子系統(tǒng)的,而這與配線子系統(tǒng)完全不同。配線子系統(tǒng)連接信息插座,同時(shí)它只存在于同一樓層。智能建筑中的綜合布線系統(tǒng)擁有四個(gè)配線子系統(tǒng),大部分先進(jìn)的通信設(shè)備都能夠在這一系統(tǒng)當(dāng)中得到充分利用;再次,干線子系統(tǒng)。這一系統(tǒng)由每一層的干線電纜、跳線及不同儀器之間的連接配線組成。它主要存在于相鄰的兩個(gè)單位中間,能夠?qū)⒑芏嗑€路設(shè)施提供給處于中心位置的公共系統(tǒng)儀器。
3智能建筑綜合布線系統(tǒng)項(xiàng)目進(jìn)度管理
3.1計(jì)劃編制
普通的智能建筑當(dāng)中,勘察現(xiàn)場(chǎng)、設(shè)計(jì)和管理工程是綜合布線項(xiàng)目實(shí)施的主要環(huán)節(jié)。在這三個(gè)主要環(huán)節(jié)當(dāng)中,要經(jīng)歷一系列步驟才能完成整個(gè)工作。如購買相關(guān)設(shè)備、驗(yàn)收材料、實(shí)施安裝工程、測(cè)試、驗(yàn)收、建檔等。從工程實(shí)施的整個(gè)過程來看,還可以將其分為準(zhǔn)備、布放線纜、安裝設(shè)備和內(nèi)裝修等四大步驟。在工程的準(zhǔn)備階段,需要進(jìn)行實(shí)地勘察、制定科學(xué)施工方案、技術(shù)交底和購買材料和設(shè)備等;第二階段應(yīng)包括預(yù)埋管線、敷設(shè)線纜;安裝設(shè)備應(yīng)包括對(duì)設(shè)備進(jìn)行檢驗(yàn)、安裝、安裝配線交接間和機(jī)房設(shè)備;最后的內(nèi)裝修階段包括測(cè)試系統(tǒng)、交付、整改等內(nèi)容。
3.2進(jìn)度控制
一方面,智能建筑綜合布線系統(tǒng)在施工過程中,對(duì)施工進(jìn)度及現(xiàn)狀的監(jiān)督是非常重要的?,F(xiàn)階段主要采用兩種方式來開展監(jiān)督工作,即日常監(jiān)督和定期監(jiān)督,這兩種方式的結(jié)合使用,能夠使整個(gè)工程得到動(dòng)態(tài)的檢測(cè),有助于工程施工質(zhì)量的提高。無論是定期監(jiān)督還是日常監(jiān)督都應(yīng)該制作詳細(xì)的監(jiān)督報(bào)告,這樣一來,工程一旦出現(xiàn)故障,能夠有據(jù)可循。根據(jù)不同的監(jiān)督形式,報(bào)告也可以擁有不同種類,例如日常報(bào)告和特殊報(bào)告等。另一方面,項(xiàng)目施工過程中,常常會(huì)出現(xiàn)一些不可預(yù)知的客觀現(xiàn)象,導(dǎo)致一些環(huán)節(jié)的施工進(jìn)度無法按照設(shè)計(jì)進(jìn)行。然而智能建筑的綜合布線系統(tǒng)項(xiàng)目是一個(gè)系統(tǒng)的工程,每個(gè)沒有按照規(guī)劃完工的環(huán)節(jié)都將對(duì)后期的工程造成嚴(yán)重的影響。例如,某一環(huán)節(jié)提前完工,它的完工時(shí)間就應(yīng)該是后邊環(huán)節(jié)的開工時(shí)間,同時(shí)也決定了后邊環(huán)節(jié)的完成時(shí)間。整個(gè)項(xiàng)目當(dāng)中,各個(gè)環(huán)節(jié)的時(shí)間差加起來能夠決定該工程的總時(shí)間差。在日常的工作過程中,要加強(qiáng)對(duì)各個(gè)環(huán)節(jié)時(shí)間的掌握,從而總結(jié)經(jīng)驗(yàn)教訓(xùn),改善施工技術(shù)和方法,為提高工程的整體質(zhì)量打下良好基礎(chǔ)。為了有效控制施工進(jìn)度,在施工過程中可以應(yīng)用勻速作業(yè)橫道圖比較法,這一方法能夠有效分析和對(duì)比工程計(jì)劃進(jìn)度與實(shí)際進(jìn)度之間的差異。運(yùn)用勻速作業(yè)原理,結(jié)合實(shí)際檢測(cè)出來的信息,將其整理成百分比,能夠幫助人們有效的進(jìn)行深入分析。
中圖分類號(hào):G642文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):1009-3044(2011)29-7317-02
Based on the Project-driven Reform and Exploration of Network Cabling
SHEN Yuan, NIE Li-ming
(Pingdingshan University, Pingdingshan 467000, China)
Abstract: To improve didactical effectiveness and meet the social needs of the personnel training, it is necessary to do a series of innovations of the curriculum, such as the instructional design and the teaching methods, this paper summarized the teaching mode of projects-driven in network cabling course. This mode deepens the understanding of the network cabling engineering, enabling its use in teaching activities to improve teaching quality and effectiveness.
Key words: network cabling; teaching reform; projects-driven
隨著網(wǎng)絡(luò)基礎(chǔ)建設(shè)和計(jì)算機(jī)信息技術(shù)的飛速發(fā)展,以及物聯(lián)網(wǎng)的興起和廣泛應(yīng)用,目前對(duì)于建筑物的智能化程度有了更高要求,而綜合布線技術(shù)是智能建筑網(wǎng)絡(luò)基礎(chǔ)體系建設(shè)的重要組成部分。因此,綜合布線技術(shù)受到人們的重視,各高校網(wǎng)絡(luò)類專業(yè)開設(shè)了綜合布線技術(shù)的相關(guān)課程。
1 網(wǎng)絡(luò)綜合布線課程定位
《網(wǎng)絡(luò)綜合布線技術(shù)》是計(jì)算機(jī)類網(wǎng)絡(luò)技術(shù)專業(yè)的一門重要專業(yè)課程。課程的特點(diǎn)是知識(shí)量大,概念多,實(shí)踐性強(qiáng),覆蓋了網(wǎng)絡(luò)基礎(chǔ)、建筑學(xué)、管理學(xué)、寫作等基礎(chǔ)理論。課程強(qiáng)調(diào)培養(yǎng)學(xué)生擁有過硬的實(shí)踐操作能力和掌握綜合布線工程的需求分析、方案設(shè)計(jì)、工程實(shí)施、測(cè)試驗(yàn)收、管理等方面的知識(shí)。目標(biāo)是培養(yǎng)既懂專業(yè)知識(shí)和工程技術(shù),又有一定施工經(jīng)驗(yàn)的網(wǎng)絡(luò)綜合布線人才。
2 網(wǎng)絡(luò)綜合布線課程教學(xué)設(shè)計(jì)改革
我院為培養(yǎng)出符合市場(chǎng)需求的網(wǎng)絡(luò)綜合布線人才,將傳統(tǒng)的知識(shí)驅(qū)動(dòng)式教學(xué)法和任務(wù)驅(qū)動(dòng)式教學(xué)法相互結(jié)合,形成了新的一體化教學(xué)模式。采用新的教學(xué)模式使得《網(wǎng)絡(luò)綜合布線技術(shù)》成為一門理論與實(shí)踐緊密結(jié)合的課程,教學(xué)模式主要由三個(gè)部分組成:
第一、課堂教學(xué):課堂教學(xué)覆蓋了整個(gè)的綜合布線知識(shí)體系結(jié)構(gòu),包括系統(tǒng)組成、系統(tǒng)標(biāo)準(zhǔn)、發(fā)展趨勢(shì)、產(chǎn)品及選型、系統(tǒng)設(shè)計(jì)、工程施工技術(shù)、工程管理、崗位技能和系統(tǒng)測(cè)試及驗(yàn)收等知識(shí)點(diǎn)。這一部分按照知識(shí)聚合程度分章節(jié)進(jìn)行教學(xué),在掌握各個(gè)知識(shí)點(diǎn)的基礎(chǔ)上通過若干個(gè)綜合布線工程案例進(jìn)行從知識(shí)點(diǎn)到知識(shí)體系綜合,使學(xué)生對(duì)整個(gè)課程知識(shí)融會(huì)貫通;
第二、實(shí)驗(yàn)環(huán)節(jié):實(shí)驗(yàn)課主要針對(duì)學(xué)生應(yīng)掌握的操作技能的訓(xùn)練,包括:布線工具、傳輸介質(zhì)和連接器件的認(rèn)知,雙絞線跳線的制作,110型和快接式通信配線架端接,PVC管槽安裝,信息面板端接安裝,機(jī)柜安裝,光纖熔接和FLUCK測(cè)線儀使用等方面的實(shí)驗(yàn)。通過這些實(shí)驗(yàn),使學(xué)生能夠很好的掌握綜合布線從業(yè)人員所掌握的基本的操作技能;
第三、課外環(huán)節(jié):每班學(xué)生劃分項(xiàng)目小組,這些小組模擬完成綜合布線項(xiàng)目從招標(biāo)、用戶需求分析、產(chǎn)品選型、工程施工、系統(tǒng)測(cè)試驗(yàn)收和用戶支持等階段,并將管理工作貫穿其中。小組之間進(jìn)行工程質(zhì)量的監(jiān)督。這樣,將綜合布線的理論知識(shí)和項(xiàng)目開發(fā)融合在一起,加強(qiáng)了理論聯(lián)系實(shí)踐的環(huán)節(jié),并且通過小組之間的監(jiān)管和交流,取長補(bǔ)短,有了這種“學(xué)習(xí)―實(shí)踐―反饋”的環(huán)節(jié),使學(xué)生能夠達(dá)到掌握小型布線工程的設(shè)計(jì)與施工技術(shù)的教學(xué)要求,能夠較好的滿足市場(chǎng)對(duì)綜合布線人才的需求規(guī)格。
3 課程改革的實(shí)踐
為了實(shí)現(xiàn)理想的教學(xué)效果,本課程的理論教學(xué)和實(shí)驗(yàn)教學(xué)課時(shí)比達(dá)到了1:1;同時(shí),在教學(xué)方法上采用項(xiàng)目驅(qū)動(dòng)式教學(xué),多種教學(xué)方法配合的教學(xué)模式,充分利用現(xiàn)代教育技術(shù),達(dá)到良好的教學(xué)效果。
第一、項(xiàng)目驅(qū)動(dòng)式教學(xué):在課堂教學(xué)中以具體的項(xiàng)目做為學(xué)習(xí)目標(biāo),將要講授的知識(shí)放在項(xiàng)目模塊中,學(xué)生通過對(duì)所提出要完成的任務(wù)進(jìn)行分析、討論,明確其中涉及到的知識(shí)點(diǎn),最后通過任務(wù)的完成實(shí)現(xiàn)對(duì)所學(xué)知識(shí)的體系構(gòu)建。利用情景模擬角色帶入的方式激發(fā)學(xué)生的學(xué)習(xí)興趣。
在《網(wǎng)絡(luò)綜合布線》教學(xué)中利用學(xué)校自身?xiàng)l件,以學(xué)校在建和完善的教學(xué)樓、實(shí)驗(yàn)樓和宿舍樓等建筑為主線,組織學(xué)生參觀學(xué)習(xí)和參與綜合布線工程施工。本課程以實(shí)際工程和案例為基礎(chǔ),組織并安排課程教學(xué),通過課堂與實(shí)踐想結(jié)合的方式,將基本理論和方法與實(shí)踐步驟融合與具體的項(xiàng)目開發(fā)之中,使學(xué)生實(shí)現(xiàn)一個(gè)綜合布線項(xiàng)目的需求分析、方案設(shè)計(jì)、布線安裝、測(cè)試驗(yàn)收和用戶支持,最終完成整個(gè)項(xiàng)目的開發(fā)。
第二、實(shí)物教學(xué):為了更好的讓學(xué)生認(rèn)知綜合布線系統(tǒng)的部件,在課堂上通過實(shí)物展示和讓學(xué)生自己動(dòng)手的方式來加深理解和知識(shí)點(diǎn)的掌握。并且在學(xué)生實(shí)踐后進(jìn)行作品點(diǎn)評(píng),通過這種學(xué)生參與、師生互動(dòng)的方式能夠很好的提高學(xué)生的學(xué)習(xí)興趣,同時(shí)也可以很好的掌握學(xué)生理解的誤區(qū),及早發(fā)現(xiàn)問題。
第三、現(xiàn)場(chǎng)教學(xué):為了更好的讓學(xué)生掌握綜合布線系統(tǒng)結(jié)構(gòu),理解綜合布線各模塊的含義,了解綜合布線線纜的路由情況,在講授綜合布線系統(tǒng)結(jié)構(gòu)時(shí),組織學(xué)生到我校網(wǎng)絡(luò)中心進(jìn)行現(xiàn)場(chǎng)教學(xué),使學(xué)生能近距離接觸綜合布線的各個(gè)子系統(tǒng),了解各子系統(tǒng)的實(shí)施情況,并請(qǐng)網(wǎng)絡(luò)中心工作人員進(jìn)行現(xiàn)場(chǎng)講解。讓學(xué)生將理論知識(shí)和現(xiàn)場(chǎng)工程實(shí)際情況相互比較學(xué)習(xí),融會(huì)貫通。
第四、現(xiàn)代教學(xué):在教學(xué)手段上,引入現(xiàn)代化的網(wǎng)絡(luò)和多媒體教學(xué)手段。理論教學(xué)采用多媒體教學(xué),將所有內(nèi)容以圖形圖片,視頻動(dòng)畫的方式表現(xiàn)出來,使呆板的理論知識(shí)形象化。同時(shí)通過網(wǎng)絡(luò),將綜合布線相關(guān)的各種標(biāo)準(zhǔn),設(shè)計(jì)圖紙,施工工藝和案例文檔發(fā)送到學(xué)生的交流群中,使學(xué)生的自主學(xué)習(xí)有了更大的空間和時(shí)間的選擇。
4 結(jié)論
項(xiàng)目驅(qū)動(dòng)的教學(xué)模式在我院實(shí)施以來獲得了廣大同學(xué)的認(rèn)可,由于貼近工程,學(xué)生學(xué)習(xí)和參與的積極性很高,同時(shí)通過參觀,專家講解,討論和實(shí)踐,學(xué)生們的專業(yè)技能有了非常大的提高。
下一步,我院將與校外綜合布線單位進(jìn)行合作,將教學(xué)模式由校內(nèi)工程發(fā)展至校外,開展工學(xué)結(jié)合,保證這種教學(xué)模式的可持續(xù)性和先進(jìn)性,并不斷完善改進(jìn)。
參考文獻(xiàn):
[1] 于鵬, 丁喜綱. 網(wǎng)絡(luò)綜合布線技術(shù)[M]. 北京:清華大學(xué)出版社,2009.
[2] 王公儒, 孫社文. 網(wǎng)絡(luò)綜合布線人才需求規(guī)格和培養(yǎng)模式探討[J]. 計(jì)算機(jī)教育,2009(9):44-49.
中圖分類號(hào):TU71 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):
一、智能建筑綜合布線方案
綜合布線系統(tǒng)是指建筑物內(nèi)部之間的傳輸網(wǎng)絡(luò)。綜合布線系統(tǒng)能使原本冰冷的建筑物具備智能化功能。通過綜合布線系統(tǒng)不僅使建筑物內(nèi)部的消防應(yīng)急、通風(fēng)供熱等系統(tǒng)處于自動(dòng)控制管理狀態(tài),更實(shí)現(xiàn)了建筑物內(nèi)部的電話視頻語音通信、有線電視及網(wǎng)絡(luò)數(shù)據(jù)通信設(shè)備、監(jiān)控監(jiān)管信息交換系統(tǒng)、建筑物物業(yè)管理及建筑物自動(dòng)化管理等系統(tǒng)彼此互通,并且實(shí)現(xiàn)建筑物內(nèi)部的通信網(wǎng)絡(luò)與外部的通信網(wǎng)絡(luò)相互連接的功能。為了區(qū)別與常用電系統(tǒng),這部分的綜合布線系統(tǒng)也稱為弱電系統(tǒng)布置,通常只用于實(shí)現(xiàn)數(shù)據(jù)通信交換及自動(dòng)控制功能。
以南寧市某公司投資的高層住宅智能化弱電集成系統(tǒng)綜合布線工程為例,該住宅樓總建筑面積約10萬㎡,總戶數(shù)880戶。智能化弱電系統(tǒng)主要包含以下八個(gè)子項(xiàng)目系統(tǒng):電話子系統(tǒng)、網(wǎng)絡(luò)子系統(tǒng)、有線電視子系統(tǒng)、樓宇彩色可視對(duì)講系統(tǒng)、電視監(jiān)控子系統(tǒng)、周界紅外線報(bào)警子系統(tǒng)、電子巡更子系統(tǒng)、門禁停車場(chǎng)IC卡管理子系統(tǒng)、樓宇背景音樂子系統(tǒng)、樓宇BA自控系統(tǒng)等,施工周期450天。本項(xiàng)目是采用八個(gè)子系統(tǒng)綜合布線及聯(lián)合調(diào)試的方式進(jìn)行綜合布線設(shè)計(jì)及施工管理,整合了資源,充分發(fā)揮了結(jié)構(gòu)化布線、單次完成的優(yōu)勢(shì)。
二、綜合布線方案施工管理
智能建筑綜合布線工程是一項(xiàng)整合程度高、各專業(yè)聯(lián)系緊密的施工工程項(xiàng)目,因此必須制定嚴(yán)格的施工組織計(jì)劃,對(duì)施工管理進(jìn)行管控。以本項(xiàng)目為例,在施工管理上就主要抓好以下幾項(xiàng)實(shí)施要點(diǎn)。
1、組建項(xiàng)目管理機(jī)構(gòu),優(yōu)選富有經(jīng)驗(yàn)的管理人員及施工班組進(jìn)行施工,設(shè)置完整的施工質(zhì)量、安全管理體系,明確崗位職責(zé)。施工組織機(jī)構(gòu)一般要分設(shè)技術(shù)負(fù)責(zé)人及采購經(jīng)理兩個(gè)重要崗位,采購經(jīng)理主要負(fù)責(zé)與供貨商和集成方保持聯(lián)絡(luò),獲得對(duì)方的產(chǎn)品技術(shù)支持。技術(shù)負(fù)責(zé)人主要負(fù)責(zé)項(xiàng)目技術(shù)工作,包括質(zhì)量檢查、新技術(shù)應(yīng)用以及文件資料控制、檢驗(yàn)試驗(yàn)、糾正預(yù)防質(zhì)量審核等要素的具體實(shí)施,可由主任工程師兼任。其余專業(yè)和人員可以參照下表的專業(yè)分工進(jìn)行適量刪減。
2、根據(jù)工期要求合理安排施工進(jìn)度計(jì)劃,根據(jù)施工進(jìn)度計(jì)劃按步驟安排各專業(yè)進(jìn)場(chǎng)以及施工時(shí)間,各項(xiàng)工作要留有裕度及調(diào)整時(shí)間??紤]到不同項(xiàng)目建設(shè)中的條件準(zhǔn)備、設(shè)備訂貨及運(yùn)輸、項(xiàng)目施工等因素,工程實(shí)施進(jìn)度計(jì)劃及項(xiàng)目進(jìn)度管理按照多專業(yè)交叉作業(yè)方式進(jìn)行,以便控制項(xiàng)目實(shí)施進(jìn)度。分解步驟和注意事項(xiàng)有:①設(shè)計(jì)部門進(jìn)入現(xiàn)場(chǎng)進(jìn)行現(xiàn)場(chǎng)勘測(cè),完成布線設(shè)計(jì)和平面施工圖設(shè)計(jì),提出設(shè)備及材料采購清冊(cè);②根據(jù)合同條款要求以及設(shè)計(jì)部門提供的設(shè)備及材料采購清冊(cè),材料采購部進(jìn)行材料采購,材料應(yīng)分批及時(shí)進(jìn)場(chǎng),保存在工地臨時(shí)庫房;③組織施工人員進(jìn)場(chǎng)施工,準(zhǔn)備好詳細(xì)的工程施工圖紙以及一切工程準(zhǔn)備工作,如搭建臨時(shí)設(shè)施、吊齊機(jī)具等;④科學(xué)的安排施工進(jìn)度,積極與業(yè)主和土建方取得配合,避免人員安排和工序安排的不合理情況出現(xiàn);⑤施工過程中定期召開工程現(xiàn)場(chǎng)會(huì),及時(shí)解決工程施工問題,調(diào)整人員安排;⑥質(zhì)量監(jiān)督人員以及項(xiàng)目經(jīng)理要定期和不定期的抽查工段施工質(zhì)量,及時(shí)對(duì)工程質(zhì)量和安全生產(chǎn)進(jìn)行監(jiān)督;⑦工程每一階段完工后,要及時(shí)組織工程驗(yàn)收時(shí)整理工程相關(guān)記錄資料,做好工作總結(jié),為工程結(jié)算做好準(zhǔn)備。
3、建立完善的崗位責(zé)任制度,使用強(qiáng)化激勵(lì)與約束手段對(duì)子項(xiàng)目施工管理效果進(jìn)行業(yè)績?cè)u(píng)定。在施工中實(shí)施目標(biāo)考核,激發(fā)全體管理人員的工作責(zé)任心與積極性,推動(dòng)項(xiàng)目整體管理水平的提高。各個(gè)子項(xiàng)目要建立健全項(xiàng)目工長、內(nèi)業(yè)、材料、質(zhì)量、安全等崗位責(zé)任制,定期對(duì)各專業(yè)進(jìn)行考核。對(duì)項(xiàng)目經(jīng)理、業(yè)主認(rèn)為不稱職的管理人員及施工班組立即更換。
4、加強(qiáng)業(yè)主、監(jiān)理、設(shè)計(jì)部門與施工班組之間的良性溝通。除了定期召開現(xiàn)場(chǎng)辦公會(huì),重點(diǎn)解決項(xiàng)目的資金、質(zhì)量、速度等難題之外,還要保持每周召開由項(xiàng)目經(jīng)理或者技術(shù)負(fù)責(zé)人主持的現(xiàn)場(chǎng)施工班組朋友會(huì),對(duì)本周的施工進(jìn)度和施工質(zhì)量進(jìn)行總結(jié),對(duì)下周的工作開展進(jìn)行協(xié)調(diào)安排。
5、做好技術(shù)交底工作,由監(jiān)理或者項(xiàng)目管理部門組織各個(gè)施工班組人員熟悉施工圖紙和相關(guān)技術(shù)資料,特別是廠家設(shè)備的安裝資料和技術(shù)指標(biāo),勘察工地現(xiàn)場(chǎng),充分了解和掌握不同子項(xiàng)目的系統(tǒng)設(shè)計(jì)意圖以及功能特點(diǎn)。隨著施工工程進(jìn)度的展開,還要不定期的組織班組進(jìn)行專題培訓(xùn)和技術(shù)研討,提高施工技術(shù)水平,增強(qiáng)質(zhì)量和安全意識(shí)。
6、配備充足的勞動(dòng)力,設(shè)備材料、質(zhì)量管理和安全員實(shí)現(xiàn)專人專項(xiàng)專管。勞動(dòng)力計(jì)劃落實(shí)到每班每人每小時(shí),避免出現(xiàn)窩工情況。
7、配置充足的辦公資源和倉管庫房,按工程施工工藝特點(diǎn)及進(jìn)度計(jì)劃安排主材和輔材的進(jìn)場(chǎng),以保障不同施工階段的設(shè)備安裝和階段驗(yàn)收。
三、綜合布線子工程施工存在問題及解決措施
在進(jìn)行智能建筑綜合布線施工時(shí),不同的分系統(tǒng)和子項(xiàng)目施工極易出現(xiàn)以下的質(zhì)量及安裝問題,必須針對(duì)問題進(jìn)行分析并且及時(shí)協(xié)調(diào)解決,而不能將問題刻意掩蓋或者推遲到綜合驗(yàn)收才解決。
1、土建工程的預(yù)留暗管、地槽和孔洞的數(shù)量、位置、尺寸沒有達(dá)到工藝設(shè)計(jì)要求或者不按圖紙進(jìn)行施工。遇到這種情況,應(yīng)當(dāng)通過設(shè)計(jì)部門與業(yè)主和設(shè)計(jì)單位溝通,查驗(yàn)土建施工驗(yàn)收記錄和監(jiān)理驗(yàn)收記錄,明確是否屬于施工錯(cuò)誤問題。如暗埋的線管無法滿足施工要求,要求設(shè)計(jì)單位出具設(shè)計(jì)變更或者土建施工單位重新返工。相應(yīng)的返工以及問題處理時(shí)間必須以正式往來信函傳真或者會(huì)議紀(jì)要的形式記錄下來,作為將來施工工期延期以及索賠的依據(jù)。2、業(yè)主采購的設(shè)備以及材料不符合設(shè)計(jì)要求,或者達(dá)不到行業(yè)標(biāo)準(zhǔn)驗(yàn)收要求。在施工前應(yīng)對(duì)所安裝的設(shè)備外觀、型號(hào)規(guī)格、數(shù)量、標(biāo)志、標(biāo)簽、產(chǎn)品合格證、產(chǎn)地證明、說明書、技術(shù)文件資料進(jìn)行檢驗(yàn),檢驗(yàn)設(shè)備是否選用廠家原裝產(chǎn)品,設(shè)備性能是否達(dá)到設(shè)計(jì)要求和國家標(biāo)準(zhǔn)的規(guī)定。如果遇到設(shè)備及材料不符合驗(yàn)收標(biāo)準(zhǔn)的情況,則必須在設(shè)備安裝之前以工程聯(lián)系單的函告提出,征詢業(yè)主此類設(shè)備是否進(jìn)行安裝的明確意見。如只是部分設(shè)備出現(xiàn)質(zhì)量問題,則必須告知業(yè)主進(jìn)行退換貨處理,相應(yīng)的工期進(jìn)行扣減。
3、單系統(tǒng)調(diào)試以及聯(lián)合調(diào)試無法同步。這種情況主要出現(xiàn)在不同的子系統(tǒng)的平臺(tái)兼容上,比如樓宇的自控BA系統(tǒng),分為變配電監(jiān)測(cè)和樓宇照明兩大模塊,其必須與消防火災(zāi)報(bào)警系統(tǒng)和自動(dòng)報(bào)警系統(tǒng)進(jìn)行聯(lián)動(dòng)。發(fā)生火災(zāi)時(shí),必須關(guān)閉普通照明開啟應(yīng)急燈,而發(fā)生盜竊事件報(bào)警時(shí),則自動(dòng)開啟相應(yīng)區(qū)域的照明系統(tǒng)等。但是在實(shí)際調(diào)試中,由于不同系統(tǒng)的現(xiàn)場(chǎng)感應(yīng)模塊和感應(yīng)裝置的敏感程度不同,會(huì)出現(xiàn)誤報(bào)、漏報(bào)、漏開啟的情況,因此必須在調(diào)試階段對(duì)整個(gè)智能系統(tǒng)進(jìn)行多個(gè)模擬狀態(tài)的試運(yùn)行調(diào)試,測(cè)試各個(gè)子系統(tǒng)的配合程度,將不同敏感程度的測(cè)試系統(tǒng)調(diào)整同步,達(dá)到運(yùn)行效果的最優(yōu)化布設(shè)。
四、結(jié)束語
通過智能自控系統(tǒng),可以對(duì)智能化建筑內(nèi)內(nèi)所有建筑設(shè)備采用現(xiàn)代化技術(shù)進(jìn)行全面有效的監(jiān)控和管理。由于建立了統(tǒng)一的管理系統(tǒng),實(shí)現(xiàn)樓宇內(nèi)機(jī)電設(shè)備的數(shù)據(jù)共享、數(shù)據(jù)分析和遠(yuǎn)程監(jiān)控,可以確保樓宇內(nèi)所有設(shè)備處于高效、節(jié)能、最佳運(yùn)行狀態(tài)。采用智能綜合布線以及自動(dòng)控制系統(tǒng)的大廈,比普通的樓宇節(jié)約了大約7%的管理費(fèi)用??梢哉f,采用智能化布線,不僅為業(yè)主提供一個(gè)了安全、舒適、快捷的工作及生活環(huán)境,也達(dá)到了節(jié)約降耗、方便管理的目的。隨著建筑智能化設(shè)計(jì)及施工水平的進(jìn)一步提升,將為我們的工作及生活提供一個(gè)更為優(yōu)越的環(huán)境。
參考文獻(xiàn):
[1]張錫英.淺談智能建筑弱電設(shè)計(jì)方案與綜合布線應(yīng)用中存在的問題[J].科技致富向?qū)?2012年第08期
[2]肖海峰.智能化樓宇電氣設(shè)備的研究和應(yīng)用[D] .華南理工大學(xué).2011年
網(wǎng)絡(luò)綜合布線設(shè)計(jì)與實(shí)施課程建設(shè)根據(jù)行業(yè)發(fā)展和職業(yè)需要不斷調(diào)整和完善教學(xué)內(nèi)容,改進(jìn)課程的考核方法,課程建設(shè)與改革成果得到同類院校的廣泛關(guān)注與行業(yè)專家們的較高評(píng)價(jià)。課程建設(shè)是一個(gè)不斷豐富和提升的過程,應(yīng)當(dāng)根據(jù)社會(huì)需求和行業(yè)發(fā)展,不斷推動(dòng)課程內(nèi)容與形式的發(fā)展。為了增強(qiáng)學(xué)生的學(xué)習(xí)熱情和教學(xué)效果,應(yīng)加強(qiáng)項(xiàng)目施工實(shí)際情景的研究,提煉出能體現(xiàn)相應(yīng)工作過程的經(jīng)典案例,以任務(wù)驅(qū)動(dòng)、項(xiàng)目引導(dǎo)教學(xué)法教學(xué)。任務(wù)驅(qū)動(dòng)教學(xué)是情境教學(xué),也是學(xué)生自主學(xué)習(xí)。教師是學(xué)習(xí)情境的創(chuàng)設(shè)者、學(xué)習(xí)任務(wù)的設(shè)計(jì)者、學(xué)習(xí)資源的提供者、學(xué)習(xí)活動(dòng)的組織者和學(xué)習(xí)方法的指導(dǎo)者,學(xué)習(xí)的主體是學(xué)生,突出學(xué)生的主體地位。學(xué)生在一個(gè)個(gè)典型的案例處理任務(wù)的驅(qū)動(dòng)下展開學(xué)習(xí)活動(dòng),在一次次完成任務(wù)的過程中展示自我,不斷積累經(jīng)驗(yàn),獲得成功和自信。
一、項(xiàng)目化情境教學(xué)改革與研究的方向
通過對(duì)網(wǎng)絡(luò)綜合布線設(shè)計(jì)與實(shí)施的調(diào)研及經(jīng)典案例的收集、分析、歸納和總結(jié),明確網(wǎng)絡(luò)綜合布線設(shè)計(jì)與實(shí)施項(xiàng)目,學(xué)生能在技能方面的具體要求及完善培養(yǎng)措施,研究熟練地使用網(wǎng)絡(luò)布線工具,具有完成網(wǎng)絡(luò)施工中部件制作的能力;研究具有合理地選擇布線材料和網(wǎng)絡(luò)中常見設(shè)備的能力;研究掌握進(jìn)行方案設(shè)計(jì)、工程施工、測(cè)試、組織驗(yàn)收和鑒定的技能;研究熟練掌握工程設(shè)計(jì)、施工、測(cè)試、驗(yàn)收等過程的技巧并應(yīng)用實(shí)際項(xiàng)目的能力。
二、經(jīng)典案例到教學(xué)情境的關(guān)鍵問題
要解決的關(guān)鍵問題是總結(jié)出體現(xiàn)實(shí)際工作過程需要且為學(xué)生所接受的經(jīng)典案例,全面推進(jìn)任務(wù)驅(qū)動(dòng)、項(xiàng)目引領(lǐng)的教學(xué)改革,就要確定前期調(diào)研與需求分析,確定課程性質(zhì)與定位,研討確定課程主要內(nèi)容,確定典型工作任務(wù)模型,確定考核方式和要求,由此根據(jù)綜合布線職業(yè)要求,本課程共創(chuàng)設(shè)6個(gè)學(xué)習(xí)情境,如表1所示,每個(gè)學(xué)習(xí)情境均按照工作過程的六個(gè)步驟進(jìn)行系統(tǒng)設(shè)計(jì),即從“任務(wù)情境”開始,依次按照“任務(wù)資訊”、“任務(wù)計(jì)劃”、“任務(wù)決策”、“任務(wù)實(shí)施”,最后“任務(wù)檢查與評(píng)價(jià)”,可以用來檢驗(yàn)學(xué)生的學(xué)習(xí)效果。
表1 學(xué)習(xí)情境說明表
三、學(xué)習(xí)情境設(shè)計(jì)與職業(yè)能力要求
在學(xué)習(xí)情境設(shè)計(jì)過程中,將職業(yè)能力要求細(xì)化,然后歸類總結(jié),有機(jī)分布各學(xué)習(xí)情境的教學(xué)內(nèi)容中,如下表2所示。
表2 職業(yè)能力要求一覽表
四、項(xiàng)目化情境教學(xué)改革研究的效果
經(jīng)過多年改革和研究建設(shè),《網(wǎng)絡(luò)綜合布線設(shè)計(jì)與實(shí)施》課程已成了湖南交通職業(yè)技術(shù)學(xué)院交通信息學(xué)院專業(yè)平臺(tái)課,全院學(xué)生在大二第一期必修本門改革課程。經(jīng)過改革和建設(shè),學(xué)生的實(shí)踐動(dòng)手能力、分析問題解決問題的能力、團(tuán)結(jié)協(xié)作能力都有很大的提高,得到社會(huì)的好評(píng)。專業(yè)學(xué)生參加的計(jì)算機(jī)服務(wù)維修隊(duì),利用節(jié)假日時(shí)間深入企業(yè)和社區(qū)開展專業(yè)技術(shù)服務(wù),按行業(yè)標(biāo)準(zhǔn)面向全校師生及鄰近的社區(qū)開展服務(wù),累計(jì)近千次。為全校的師生提供免費(fèi)的計(jì)算機(jī)及網(wǎng)絡(luò)技術(shù)支持,受到群眾的一致好評(píng),評(píng)價(jià)網(wǎng)絡(luò)專業(yè)學(xué)生專業(yè)技術(shù)扎實(shí),實(shí)踐能力強(qiáng)。專業(yè)能力培養(yǎng)更接近企業(yè)的需求,根據(jù)畢業(yè)生質(zhì)量跟蹤和調(diào)研,企業(yè)給予專業(yè)畢業(yè)生較好的評(píng)價(jià),一致認(rèn)為畢業(yè)生專業(yè)基礎(chǔ)扎實(shí),具有較強(qiáng)的動(dòng)手能力,職業(yè)能力較強(qiáng),能吃苦耐勞、主動(dòng)學(xué)習(xí),職業(yè)基本素質(zhì)高,就業(yè)后經(jīng)過較短時(shí)間的培訓(xùn)和適應(yīng)就能上崗。
參考文獻(xiàn):
[1]楊國榮.項(xiàng)目教學(xué)法在綜合布線課程中的實(shí)施[J].信息技術(shù),2012(04).
[2]周敏.高職《樓宇智能化技術(shù)》課程中項(xiàng)目教學(xué)法的應(yīng)用與探討[J].科技信息,2009(21).
[3]劉文靜.淺談項(xiàng)目教學(xué)法的應(yīng)用[J].遼寧教育行政學(xué)院學(xué)報(bào),2006(08).
【摘要】本文針對(duì)智能建筑與綜合布線系統(tǒng)設(shè)計(jì)與應(yīng)用進(jìn)行了分析,其中包括智能建筑中綜合布線系統(tǒng)基本概念、智能建筑與綜合布線系統(tǒng)的關(guān)系、綜合布線系統(tǒng)的功能特點(diǎn)和智能建筑中綜合布線系統(tǒng)的設(shè)計(jì)等相關(guān)內(nèi)容。
關(guān)鍵詞 綜合布線;智能建筑;系統(tǒng)
Designandanalysisofintelligentbuildingcablingsystem
ZhangJian-ni
(QuadrupleIntelligentTechnologyCo.,LtdXi´anShanxi710000)
【Abstract】Inthispaper,designandapplicationofintegratedwiringsysteminintelligentbuildingisanalyzed.Thebasicconceptsofintelligentbuilding、relationsbetweenintelligentbuildingandintegratedwiringsystem、thefunctionandcharacteristicofintegratedwiringsystem、thedesignofintegratedwiringsysteminintelligentbuildingandotherrelationcontentareincluded.
【Keywords】Integratedwiring;Intelligent;Building;System
1.綜合布線系統(tǒng)的概念
一般而言,建筑物與建筑群內(nèi)的傳輸網(wǎng)絡(luò)就是綜合布線系統(tǒng)。它不但可以使數(shù)據(jù)通訊系統(tǒng)和電話交換系統(tǒng)以及其他信息管理系統(tǒng)彼此相連,還能夠把這些設(shè)備與外部通訊網(wǎng)絡(luò)連接。建筑物到外部網(wǎng)絡(luò)或線路上的連接點(diǎn)與工作區(qū)的語音或數(shù)據(jù)終端之間的所有光纜、電纜及相關(guān)的布線部件等方面,都可以籠統(tǒng)的涵蓋到綜合布線系統(tǒng)中去。綜合布線系統(tǒng)采用的開放式星型網(wǎng)絡(luò)拓?fù)浣Y(jié)構(gòu),并采用六大子系統(tǒng)分別進(jìn)行布線的規(guī)劃設(shè)計(jì)。這六大子系統(tǒng)分別是:工作區(qū)子系統(tǒng)、水平區(qū)子系統(tǒng)、垂直干線子系統(tǒng)、設(shè)備間子系統(tǒng)、管理間子系統(tǒng)和建筑群子系統(tǒng)[1]。這其中每一個(gè)子系統(tǒng)都是獨(dú)立的單元,而且每個(gè)子系統(tǒng)都不會(huì)對(duì)其他子系統(tǒng)產(chǎn)生影響。一旦結(jié)點(diǎn)鏈接發(fā)生改變,就會(huì)導(dǎo)致整個(gè)網(wǎng)絡(luò)在星形、總線型、環(huán)形燈反面發(fā)生不同的轉(zhuǎn)換。對(duì)綜合布線系統(tǒng),來講,支持關(guān)于語音、數(shù)據(jù)、圖像、多媒體業(yè)務(wù)等信息的傳遞。
2.智能建筑與綜合布線系統(tǒng)的關(guān)系
在建筑物中用計(jì)算機(jī)技術(shù)、通信網(wǎng)絡(luò)技術(shù)、信息技術(shù)等集成在一起,對(duì)建筑內(nèi)設(shè)備進(jìn)行監(jiān)控,對(duì)信息資源管理等,這種建筑物被稱為智能建筑[2]。綜合布線系統(tǒng)是智能建筑的重要組成部分之一。1991年,美國將智能大廈綜合布線系統(tǒng)的概念引入中國,此后,越來越多的國外知名布線廠商紛紛進(jìn)入中國市場(chǎng)。自20世紀(jì)90年代以來,我國及世界各國的智能建筑蓬勃發(fā)展,出現(xiàn)了各種類型的智能建筑。隨著進(jìn)入21世紀(jì)信息時(shí)代,各種信息技術(shù)迅速發(fā)展,形成了各種類型的局域網(wǎng)、城域網(wǎng)、廣域網(wǎng)。智能建筑成為這些信息網(wǎng)絡(luò)的組成部分和歸宿。智能建筑與綜合布線系統(tǒng)的關(guān)系主要表現(xiàn)在以下5個(gè)方面:
(1)綜合布線系統(tǒng)是衡量智能建筑的智能化程度的重要標(biāo)志。在衡量智能建筑的智能化程度時(shí),需要評(píng)價(jià)建筑物內(nèi)綜合布線系統(tǒng)的配線能力。其中包括:設(shè)備配套與否、技術(shù)功能完善與否、網(wǎng)絡(luò)分布合理與否、工程質(zhì)量優(yōu)良與否。信息傳輸網(wǎng)絡(luò)的質(zhì)量和技術(shù)是智能建筑能否為用戶提供高質(zhì)量服務(wù)的重要因素。所以,綜合布線具有決定性作用;
(2)綜合布線系統(tǒng)是智能建筑中不可或缺的基礎(chǔ)設(shè)施。將智能建筑內(nèi)的通信、計(jì)算機(jī)及各種設(shè)施在一定條件下有效地連接起來,形成更完整、更完善、更優(yōu)化的有機(jī)整體。這樣能實(shí)現(xiàn)高度智能化要求的整體稱為綜合布線系統(tǒng)。綜合布線的特點(diǎn)為兼容性強(qiáng)、可靠性高、管理科學(xué)等。若在沒有綜合布線系統(tǒng)的智能化建筑中,各種設(shè)施和設(shè)備將因無信息傳輸媒質(zhì)連接而無法實(shí)現(xiàn)。所以,綜合布線系統(tǒng)是智能建筑能夠保證高效優(yōu)質(zhì)服務(wù)所不可或缺的基礎(chǔ)設(shè)施;
(3)綜合布線系統(tǒng)是智能建筑內(nèi)部聯(lián)系與外部通信的傳輸網(wǎng)絡(luò)。綜合布線系統(tǒng)在智能建筑中既是作為內(nèi)部信息網(wǎng)絡(luò)系統(tǒng)的組成部分,又必須與外部公用通信網(wǎng)絡(luò)連接起來。綜合布線網(wǎng)絡(luò)組織方式、各種性能指標(biāo)和相關(guān)技術(shù)要求都應(yīng)遵守于公用通信網(wǎng)的有關(guān)規(guī)定及標(biāo)準(zhǔn)。這樣,才能滿足智能建筑與外界聯(lián)系和傳輸信息的需求;
(4)綜合布線系統(tǒng)應(yīng)與房屋建筑融為一體。綜合布線與房屋建筑既彼此融合又彼此矛盾。因此,綜合布線系統(tǒng)的設(shè)計(jì)、安裝、施工應(yīng)與建筑工程的設(shè)計(jì)、施工、建設(shè)密切聯(lián)系,協(xié)調(diào)配合。并采取有效的、合理的方案解決矛盾;
(5)綜合布線系統(tǒng)可以適應(yīng)智能建筑今后發(fā)展的需求。綜合布線系統(tǒng)具有很高的適應(yīng)性和靈活性。在目前各地興建的高大樓群中,只有積極的采用綜合布線系統(tǒng),才能與時(shí)代同步,適應(yīng)科技發(fā)展的需要,又不增加過多的額外投資,并在今后相當(dāng)長的一段時(shí)間內(nèi)滿足通信發(fā)展的需求。
3.綜合布線系統(tǒng)的功能特點(diǎn)
3.1綜合布線系統(tǒng)具有先進(jìn)性。
綜合布線系統(tǒng)的出現(xiàn),解決了原有的布線模式中隱藏的許多缺點(diǎn)??茖W(xué)技術(shù)的迅猛發(fā)展,越來越讓人們意識(shí)到共享信息資源的重要性,尤其綜合業(yè)務(wù)數(shù)字網(wǎng)已經(jīng)逐漸的代替了以電話業(yè)務(wù)為主要標(biāo)志的通信網(wǎng)。而作為傳輸語音、數(shù)據(jù)和視頻的集成通信網(wǎng),它也正在占據(jù)著重中之重的地位。不斷的實(shí)踐經(jīng)驗(yàn)表明,綜合布線系統(tǒng)一改以往單一、高價(jià)、復(fù)雜的傳統(tǒng)布線系統(tǒng),適應(yīng)信息時(shí)代的潮流,符合歷史發(fā)展趨勢(shì)。
3.2綜合布線系統(tǒng)具有開放性。
相對(duì)來說,以往的布線系統(tǒng),束縛性太強(qiáng),用戶選擇一種設(shè)備后,也就固定了與之相匹配的布線方式及傳輸介質(zhì)。若想更換新設(shè)備,就得相應(yīng)的更換原來的布線。所有,可以想象的到,依靠這種施工方式的建筑物內(nèi),對(duì)原材料的消耗是非常大的,施工也應(yīng)該是相當(dāng)有難度的。
3.3綜合布線體統(tǒng)具有可靠性。
新型綜合布線系統(tǒng),采用的是高質(zhì)量的材質(zhì)和組合壓接的方法,是一種高技能的信息運(yùn)輸線路。綜合布線系統(tǒng)中的所有電纜和元件都是經(jīng)過ISO國家認(rèn)證的,為保證電氣性能的可靠性,采用專業(yè)儀器調(diào)試每條線路的鏈路阻抗和衰減率。系統(tǒng)的布線采用點(diǎn)與點(diǎn)之間的對(duì)接,即使有的線路出現(xiàn)了故障,也不會(huì)導(dǎo)致其他線路的運(yùn)行。因此,線路的運(yùn)行以及保養(yǎng)維修都得到了保障,可以增強(qiáng)了系統(tǒng)運(yùn)行的可靠性。
3.4綜合布線系統(tǒng)具有靈活性。
綜合布線系統(tǒng)使用系統(tǒng)子模塊設(shè)計(jì)方案,其傳輸線纜和有關(guān)零部件都符合通用標(biāo)準(zhǔn)。所以,綜合布線的各個(gè)通道都具有通用性,與此同時(shí),每一條通道都支持終端、以太網(wǎng)工作站和令牌工作站。要想開通或者改變?cè)O(shè)備,也不需要改變布線,只要簡單的增減要使用的設(shè)備,同時(shí)在配線架上采取相應(yīng)的跳線管理,就可以完成目的了。
4.智能建筑中綜合布線系統(tǒng)的設(shè)計(jì)
4.1設(shè)計(jì)工作區(qū)子系統(tǒng)。
設(shè)計(jì)工作區(qū)子系統(tǒng)時(shí),應(yīng)將信息插座安裝在墻面或地面上,同時(shí)要有單孔和雙孔兩類。數(shù)據(jù)插座要是屏蔽嵌入式插座,這樣高速網(wǎng)絡(luò)設(shè)備所接的每個(gè)數(shù)據(jù)插座都具有金屬屏蔽殼且能夠良好接地。數(shù)據(jù)插座應(yīng)是RJ45插座,能以大于15mbP/s的速度傳輸信息,各類型終端設(shè)備依靠RJ45的標(biāo)準(zhǔn)跳線能夠快捷地與數(shù)據(jù)插座連接[3]。工作區(qū)子系統(tǒng)遵循甲級(jí)標(biāo)準(zhǔn),具備“端口保護(hù)裝置”(也就是數(shù)據(jù)鎖),隔離各類信號(hào),不會(huì)因插錯(cuò)插座而損壞設(shè)備。
4.2設(shè)計(jì)干線子系統(tǒng)。
干線子系統(tǒng)是指智能建筑物內(nèi)的主干電纜的路由,將主配線架和分配線架,及其他設(shè)備相互連接起來。設(shè)計(jì)的干線傳輸不僅適應(yīng)當(dāng)下的需求,還要滿足今后的發(fā)展。分布干線子系統(tǒng)時(shí)要使用能保證干線線纜最短、最可靠和花費(fèi)最少的路由。在干線子系統(tǒng)的施工過程中,要留下少量線纜用作冗余通道,這樣保證了綜合布線系統(tǒng)能夠擴(kuò)展。
5.總結(jié)與展望
(1)本文首先介紹了綜合布線的概念,講述了綜合布線的應(yīng)用方法和應(yīng)用場(chǎng)景,然后論述智能建筑與綜合布線的關(guān)系,也即綜合布線是智能建筑不可缺少的組成部分,進(jìn)而說明綜合布線的功能特點(diǎn),最后概述智能建筑中綜合布線的設(shè)計(jì)方法。
(2)要做好建筑中綜合布線系統(tǒng)的設(shè)計(jì),就要做好工作區(qū)間子系統(tǒng)設(shè)計(jì)和干線子系統(tǒng)設(shè)計(jì)。這是計(jì)算機(jī)技術(shù)、智能樓宇技術(shù)發(fā)展結(jié)合發(fā)展的必然結(jié)果以及良好發(fā)展趨勢(shì)。三者的有效結(jié)合,不僅可以避免各子系統(tǒng)獨(dú)立設(shè)計(jì)、重復(fù)施工導(dǎo)致的種種浪費(fèi)及相互間的不利影響,還可以更加合理、有序的進(jìn)行弱電系統(tǒng)布線總體設(shè)計(jì)和統(tǒng)一施工。以此來合理的利用建筑空間,使原來雜而亂的建筑變得合理有序,并且也提高了管理和維護(hù)的水平,即節(jié)約了資金,也縮短了建設(shè)周期。
參考文獻(xiàn)
[1]劉穎論電氣技術(shù)在智能建筑設(shè)計(jì)中的應(yīng)用[J].科技傳播,2010(13).